Chapter 5: Power Up and Initial ChecksChapter 5: Power Up and Initial Checks User Console Version A3.53Page 5-1
5.1 Before Powering OnWARNING:Follow Lockout/Tagout and other safety precautions when connecting ordisconnecting cabling, wiring, and equipmen
NOTE: After an Axis Unit is powered down, the power must not be applied again for at least five (5)seconds. Repeated power up and power down
5.2 Initial Data SettingAfter completion of the System verification/power on procedure in Section 5.1, the System isready for the input of dat
switches are set to the NORMAL position. Press the REV button on the Main Unit to operate all spindles simultaneously as verificat